Rathdrum, Idaho

White Pine Power

A proposed 600 MW combined-cycle natural gas power plant.

600 MW
Firm, around-the-clock power for the Pacific Northwest
Read the Announcement
01Purpose6–9 GW regional shortfall

The Pacific Northwest needs reliable power, now more than ever.

The region is facing a growing and well-documented gap between electricity supply and demand.

PNGC Power, a generation and transmission cooperative, is partnering with Kindle Energy, an energy infrastructure development, construction, and asset management company, to build and operate the facility. Power produced will serve several cooperative members across the region.

02Why this project
01

A widening supply gap

Regional need

A 2026 independent analysis commissioned by regional utilities documents a growing gap between available generation and rising demand, especially during extreme weather when reliable power matters most.

02

Firm, around-the-clock capacity

Grid reliability

A 600 MW facility in Rathdrum would provide power the region can count on around the clock, keeping the grid stable when demand spikes and the weather doesn't cooperate with renewable options.

03

Affordable, stable energy

Cost protection

Local generation reduces exposure to volatile wholesale electricity markets that drive up costs for families and businesses throughout the region.

03By the numbers
600MW
Capacity
Firm, dispatchable, around-the-clock power for the Pacific Northwest.
50%
Hydrogen blend potential
Designed for hydrogen blending over time, with the potential for up to a 50 percent blend as the technology, fuel supply, and supporting infrastructure evolve.
24/7
Firm capacity
Dispatchable output available around the clock, whatever the weather.
~6YRS
Design & construction
Expected to be operational within approximately six years of breaking ground.
Independent assessments from the Northwest Power and Conservation Council and Bonneville Power Administration project regional energy shortfalls of 6–9 gigawatts in the coming years.
04The technologyAir-cooled · hydrogen-capable

One of the most efficient, lowest-emitting gas-fired designs in the country.

05Site & statusPermitting underway

Rathdrum, Idaho.

SiteRathdrum, Idaho
CountyKootenai County
RegionIdaho Panhandle
StatusPreparing and submitting permitting and regulatory applications to the applicable Idaho state and federal authorities.
06Project timeline~6 years to operation
01

Early design and development

The project team is finalizing site studies, technical configuration, and early stakeholder engagement.

02

Permitting and regulatory filings

Current phase

Submission of required applications to applicable Idaho state and federal regulatory authorities.

03

Securing final permits

Response and education regarding any public comments and securing final local, state, and federal permits.

04

Construction start

Pending all required approvals, construction is targeted to begin following the regulatory review period.

07Questions & answersWater · noise · development

Frequently asked questions.

01Regional Need & The Project3 questions+
Why does the Pacific Northwest need a new power plant?

The region faces a growing gap between electricity supply and demand. The Northwest Power and Conservation Council and Bonneville Power Administration project shortfalls of 6–9 gigawatts in coming years, driven by population growth, electrification, and the retirement of existing generation. This is a present, accelerating challenge requiring investment now.

What type of gas plant is this?

A combined-cycle natural gas plant in Rathdrum, Idaho, designed to be one of the most efficient, lowest-emitting gas-fired resources in the U.S. It will provide reliable, around-the-clock power to Pacific Northwest cooperatives and communities, with operation expected roughly six years after breaking ground.

When will construction begin and when will the plant be operational?

Design and construction are expected to take approximately six years.

02Development1 question+
Who is developing this project?

PNGC Power, an electric generation and transmission cooperative owned by 25 electric distribution cooperatives across Idaho, Montana, Nevada, Oregon, Utah, Washington, and Wyoming, is partnering with Kindle Energy, an energy infrastructure development and asset management company with experience developing and operating power generation assets nationwide.

03Water Use & Quality2 questions+
How does the plant plan to minimize its water use?

Instead of traditional wet cooling, the plant uses an air-cooled condenser (ACC), condensing steam with air rather than evaporating water. The condensed steam recirculates in a closed loop, significantly reducing water use compared to wet-cooled facilities.

What will happen to water quality in the area?

The plant will comply with all Clean Water Act requirements, including NPDES permitting. No untreated process water will be discharged to local waterways.

04Noise1 question+
How loud will the plant be?

A noise impact study will guide the design to meet Rathdrum's noise ordinance and applicable county standards. Turbines will use aerodynamic design and inlet/exhaust silencing for sound attenuation. Post-construction monitoring will be available as needed. In similar Kindle projects, fenceline noise (~200 ft from the source) averaged about 45 dBA — comparable to a library or a quiet suburban night.

08ContactDirect to the project team

Contact us.

Questions, comments, or concerns about the project? Reach the team directly or use the form.

Project Emailinfo@whitepinepower.com
Phone(208) 264-4571
Project impact

This project is about serving Northwest communities with the reliable and affordable energy they will need in the years ahead.